About Nirmal Singh

A Visionary Leader in India’s Hydropower Engineering & Project Execution

Shri Nirmal Singh is a highly respected engineering and project execution leader who has served for over 33 years with NHPC Limited, India’s premier hydropower organization. Throughout his remarkable career, he has played a pivotal role in delivering some of the nation’s most challenging and strategically crucial hydroelectric power projects.

Recognized for his exceptional leadership, commitment to engineering excellence and unwavering dedication, he led the successful commissioning of the 800 MW Parvati-II Hydroelectric Project—a historic achievement marked by the completion of India’s longest 32-kilometer underground Head Race Tunnel (HRT), overcoming extreme Himalayan geological and environmental challenges. This landmark accomplishment earned him national recognition, including an honour from the Hon’ble Power Minister of India. He has been actively involved in contract resolution and Arbitration handling across multiple mega hydroelectric projects.

Today, he continues to remain a respected figure in the hydropower sector, admired for his strategic vision, field expertise, and legacy of excellence.

Education & Professional Qualifications

Strong Academic Foundation & Specialized Technical Expertise

Shri Nirmal Singh has built a strong academic and professional foundation that complements his extensive experience in hydroelectric project execution and leadership. With qualifications in Civil Engineering, Management, Arbitration Law, and Commercial Arbitration, he possesses a rare combination of technical, administrative, legal, and dispute resolution capabilities.

IgnouLogoW (1)
Diploma in Management

IGNOU — 1996

Annamalai_University_logo
Bachelor of Engineering – Civil Engineering

Annamalai University, Tamil Nadu — 1988

OG-logo
PG Diploma in Arbitration Law

National Law School of India University, Bengaluru — 2025

33+ Years of Distinguished Service in NHPC Limited

Throughout his exemplary three-decade journey with NHPC Limited, Shri Nirmal Singh has successfully led the execution of some of India’s most challenging hydroelectric power projects, rising from Engineer to the prestigious position of Executive Director.

worker-hat_10156649
Engineer to Senior Manager (Civil) - NHPC

Aug 1991 – May 2012 

Remained associated with the execution of major hydropower projects, including Chamera-I (540 MW), Dulhasti (390 MW), Kurichu Bhutan (45 MW), Parbati-II (800 MW), and Chutak (44 MW) after covering Dam construction, Tunneling, and Technical operations.

worker-hat_10156649
Chief Engineer

May 2012 – Dec 2016 

Project construction work, contract management & arbitration for Parbati-III (520 MW).
worker-hat_10156649
General Manager

Jan 2017 – Feb 2022 

Head of Dulhasti Power Station & Parbati-II Projects; contract management & dispute resolution.

worker-hat_10156649
Group General Manager

Feb 2022 – Aug 2023 

Responsible for management operations of the Parbati-II Project.
worker-hat_10156649
Executive Director

Sep 2023 – Jun 2025 

Head of Chandigarh Region managing five major hydroelectric projects/power stations —Parbati-II (800 MW), Parbati-III (520 MW), Tanakpur (120 MW), Dhauli Ganga (280 MW), and Dugar (500 MW). Led commissioning of 800 MW Parbati-II HEP and completion of India’s longest 31.56 km HRT Tunnel.

Area of Specialization

WhatsApp Image 2025-11-15 at 7.55.02 PM

Technical Operation

Execution of Hydro Projects in general, and Civil and Hydro Mechanical works / Structure in particular — including planning, execution, and commissioning of Hydro Projects.
Devised construction methodologies, resource and equipment planning as per construction schedule.

Executed/played a key role in:

  • Infrastructure works of Chamera1and Dulhati H.E Projects.
  • Dam, Powerhouse and Tunnel construction works at Kurichu, Parvati-II and Parbati-III H.E Projects.
  • Hydromechanical works at Parbati-II H.E Project.
  • Operation of Parbati-III,Dulhasti,Dhauliganga and Tanakpur Power stations.
  • Investigation of Dulhasti-II and Duggar H.E Projects

Handled major contracts including amicable dispute resolution and arbitration matters, delegating responsibilities enabling timely commissioning of projects.

Management

Handled responsibility as Head of Project (HoP) of various Hydro Projects at General Manager & Executive Director level, and Regional Head of five Projects / Power Stations. Successfully supervised administrative, technical, workforce and cross–department coordination for project execution.
WhatsApp Image 2025-11-15 at 7.52.52 PM

Dispute Resolution

Settled major contractor claims at Parbati Project (HP) without going into arbitration, paving the way for project completion. Worked as High-Level Committee Member ensuring transparent & result-oriented decisions.
Years Service in NHPC Limited
0 +
Major Projects
0 +
States
0 +
Media Highlights
0 +

Certifications

logo
Professional Certificate in Commercial Arbitration, Indian Institute of Arbitration and Mediation, 2025.
logo (1)
Fellow Membership & Chartered Engineer, The Institution of Engineers (India), 2024–2025
Contract Law Certification Course, Harvard University (Online), 2025.
logo
Empanelled as Certified Arbitrator with Indian Institute of Arbitration and Mediation2025
product
Fellow Membership & Chartered Engineer, The Institution of Engineers (India), 2024–2025

Let’s talk about your project

    WhatsApp Image 2025-11-15 at 7.55.02 PM